Since Michelle was away this past week in Las Vegas attending a medical conference (and visiting her family), we decided this would be the best time to commence Operation Destruction/Renovation of our kitchen and bathrooms. The previous owners chose this cheap laminate surfacing (white & pink, respectively) that stained quite easily. Once again the before shots:
First step was removing the surfacing. Since we were installing two sinks in the master bathroom, the old cabinet had to come out and a new custom-designed cabinet was put in its place:
Next step was inserting the granite counter-tops. Michelle & I had pre-selected three different patterns, one for each room. Most of the pieces were pre-cut, but the sink openings and backsplashes were cut outside on our driveway:
It was only at this point that the plumber could begin connecting the sinks & piping. His job took the longest, at least 8 hours of labor involved:
An voila! A nicely finished project after all ... you'll have to visit to see the real thing :-)