

First step was removing the surfacing. Since we were installing two sinks in the master bathroom, the old cabinet had to come out and a new custom-designed cabinet was put in its place:




Next step was inserting the granite counter-tops. Michelle & I had pre-selected three different patterns, one for each room. Most of the pieces were pre-cut, but the sink openings and backsplashes were cut outside on our driveway:


It was only at this point that the plumber could begin connecting the sinks & piping. His job took the longest, at least 8 hours of labor involved:



An voila! A nicely finished project after all ... you'll have to visit to see the real thing :-)



1 comment:
Wow, nice looking cabinets!! I really like the cabinets and his&her sinks. The dark color is really nice looking. Don't make that house too nice - you won't want to leave Michigan when you're done.
Post a Comment